page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45 page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
43
Box 4.3 Trials of HDPE linings at El Tinte, Peru
The installation of HDPE lining at El Tinte was carried out
in a trapezoidal excavation of 1.2 m width. The material
was laid in a single sheet of 25 m length in a straight
section of the canal as shown in Photograph 4.9. The
thickness of the HDPE sheet was 6 mm. The sheet was
anchored by excavating 150 mm square anchor
trenches parallel to the main canal on each side and
then ramming earth into the anchors, as illustrated in
Figure 4.2 below.
PVC and butyl/ rubber are some of the membrane types
commonly used. Note the differences in this design with
the El Tinte HDPE lining. For example, this design has
gentler side slopes and the lining is covered with sieved
soil, which protects it from being damaged by people
and cattle. This type of plastic lining minimises seepage
loss but requires more labour time for placing it. Laying
the plastic sheet needs careful attention to ensure that it
is not punctured.
Figure 4.2 HDPE Lining at El Tinte, peru.
The labour required for this operation was one
supervisor and one assistant for one day, although a
longer section or one involving curves, would have re-
quired greater time in jointing and cutting the material.
An analysis of costs shows the HDPE-lined canal to be
US$ 10 per m2 for materials delivered to site, which
results in $20 per linear metre of completed canal includ-
ing labour costs. The additional labour cost for a canal
with curves and joints is estimated to be US$ 0.30 per
linear metre.
An estimate of the cost of a concrete canal of the same
dimensions would be around US$ 12 per linear metre.
An alternative buried membrane lining method is pro-
posed in Ref. 5. This is shown below in Figure 4.3. HDPE,
Photo 4.9 HDPE lining at El Tinte, Peru
Figure 4.3 Buried membrane lining porposed in design manual’s for Irritation Projects in Nepal.